Currently under my needle: “practice underwear” for Mr. T. He was confused by the term “training pants”. He kept looking at them asking where the train was. I love three year old brains.

Here are the pieces all cut out. I just used scrap knit to blow through some of my smaller pieces.

Two down, eight to go.